// Case Study
400+ orders/month. Zero manual data entry.
How I automated the entire order-to-production pipeline for a custom 3D printing manufacturer, eliminating 33 hours of monthly labor in a weekend build.
Every order is unique. Every mistake costs hours.
VelossaTech sells custom 3D-printed automotive parts. 15+ vehicle brands, 28+ body colors, 6 flare shapes, optional LED kits. No two orders are the same. Every single one needs to hit a Google Sheet with the exact right production specs before a printer starts.
At 400+ orders per month, that meant someone typing every order by hand. Five minutes each. Reading Shopify, translating color names to shorthand, building composite SKUs, splitting multi-item orders into separate production lines.
35 hours a month of pure data entry. And when December hit 549 orders, the process broke. One wrong color code means a part gets printed wrong, wasting material, time, and a customer's patience.
A pipeline that does the whole job, every hour, without being asked.
Orders
+ Dedup
Transform
SKUs
Sheet
I built an automation that connects Shopify to the production sheet the team already uses. No new tools. No retraining. Orders just started appearing, correctly formatted, without anyone touching them.
The system handles everything: 28+ color mappings, composite SKU generation, multi-item order splitting, cancellation detection, shipping tracking, cross-month boundary orders, and edge cases that would take a human 10 minutes to untangle.
Built in a weekend. Deployed on their infrastructure. No monthly retainer, no vendor lock-in. They own it completely.
Six months, zero intervention.
- ~33 hours/month of data entry eliminated. Staff redirected to production, QC, and customer service.
- Zero color/variant errors. Automated lookup tables produce consistent shorthand every time.
- Cancellations caught within 60 minutes. No more printing parts for orders that don't exist.
- 549 orders in December handled without overtime. The same pipeline that processes 242 orders processes 549. It just runs more often.
- 218 multi-item orders auto-split into separate production lines across 6 months.
- 371 deliveries tracked automatically in a single month with hourly status syncs.
Your operations have the same problem.
30-minute call. I'll find the bottleneck and show you exactly where automation fits.
Book a Free Consultation